Logo Basic

Upgrade Sinuperm M Project

Upgrade / Replacement of Sinuperm M in German Nuclear Powerplant with ProTK

Project Overview

  • 54 Siemens Sinuperm M measuring systems have been exchanged between 2013 - 2019
  • Existing cables and detectors have been kept
  • Scope of Supply:
    • 6x gamma-aerosol monitoring
    • 19x local dose rate monitoring
    • 6x noble gas activity monitoring
    • 7x beta-noble gas activity monitoring
    • 1x beta-noble gas high activity monitoring
    • 15x water activity monitoring

Mirion also provided complete documentation package including electrical drawings,certificates, FAT and SAT documentation, and much more.

Support

Looking for Services or Support?
We're here to help.